EV Chargers in Austin

What we do (Austin)

  • Level-2 EV charger installs (hardwire or NEMA 14-50)
  • Panel checks and load management
  • Permits and Austin Energy rebate guidance

Permit basics (Austin)

  • Hard-wired or new 240V circuits require a City permit and inspection.
  • Typical timeline: application 1–2 days, install 1 day, inspection 1–3 days.

Austin Energy rebate snapshot

  • Up to $1,200 for Level-2 home charging when installed by a licensed electrician.
  • Keep your paid invoice and installation photos; submit after final inspection.

How Get Matched works

  • Answer 6 quick questions
  • See your likely price band/heading
  • We connect you to ONE vetted electrician

FAQs

  • Q: Do I need a permit for a NEMA 14-50? A: Yes if it’s a new dedicated 240V circuit. Existing receptacle replacements typically do not.
  • Q: How long does a typical install take? A: Most are completed in a day; trenching/detached garages add time.
  • Q: Can I avoid a panel upgrade? A: Often yes with a load calculation or load management device; we’ll triage on the form.